HEADLINES

Chappaqua Road Closures July 22 to July 26

Road Closures

Asplundh and Con Ed are removing a number of large trees along Croton Lake Road (between Lake Road and Seth Canyon Drive) next week: July 22 to July 26. This will require a total closure of the road from 9:00 am to 4:00 pm each day (Monday to Friday). Large cranes are required to remove the trees safely.

Message Boards have been placed along the roads to alert residents and travelers along the road of the planned work- detour signs have been erected as well.

We apologize for the inconvenience.

 

Subscribe

Follow Chappaqua HamletHub