Town of Southbury Road Work Report for Week of June 24

Town of Southbury Road Work Report

Chip Seal Roads Completed as of 6/20/2019:

Most roads have had loose stone swept up and sweeping will continue on roads that have not been swept. Fog sealing on these roads to begin the week of July 10, 2019. Work is expected to be completed within three weeks. Schedule subject to change due to weather and contractor availability.

  • Beacon Hill Road
  • Blueberry Lane
  • Church Road
  • East Flat Hill Road
  • Hampton Court
  • Hilow Road
  • Hornet Nest Road
  • Lake Ridge Road
  • Lakemere Drive
  • Lower Fish Rock Road
  • Old Field Hill Road
  • Old Field Road (Heritage Road to Old Field Hill)
  • Old Oakwood Drive
  • Old Woodbury Road
  • Pine Hill Road
  • Purchase Brook Road (Stillson to Spruce Brook Road)
  • Rockridge Road
  • Royal Coach Lane
  • Russell Road
  • Russian Village Road
  • Scout Road
  • Southwoods Terrace
  • Spruce Brook Road (Stillson Road to Purchase Brook Road)
  • Spruce Brook Road (Meadowbrook to Stillson Road)
  • Stillson Road
  • Sterling Ridge
  • Stony Corners Lane
  • Upper Fish Rock Road
  • Valley Stream Lane
  • Vista View Drive
  • West Flat Hill Road
  • White Birch Drive
  • White Pine Road
  • Woods Way Drive

Roads to be Chip Sealed beginning Week of June 24, 2019:

Work expected to be completed within two weeks. Schedule subject to change due to weather and contractor availability.

  • Ballantine Park
  • Bucks Hill Road
  • Crook Horn Road (Roxbury Road into Settlers Park)
  • Harvest Lane
  • Mansion House Road
  • Munn Road
  • New Road
  • Old Waterbury Road
  • Purchase Fire Dept.
  • Short Rock Road
  • Timberland Way
  • West Purchase Road

Mill and Pave projects tentatively scheduled for late July:

  • Cedar Crest Drive
  • Georges Hill Road (from just South of Laurelwood Lane to just south of Cooper Hill Road)
  • Lakeside Road (Georges Hill Road to Fish Rock Road)
  • Parking lots within the town complex (Town Hall lower lot, Fire Dept. upper lot, Police lot)

Cold in place recycling with surface treatment tentatively scheduled for August:

  • Patriot Road

Road reconstruction scheduled for September:

  • Hickory Lane

Tree Removal in preparation for Road reconstruction:

  • Hollow Swamp Road

Catch Basin Repair as scheduling allows:

  • Heritage Road (Pomperaug River Bridge to Bates Rock Road)
  • East Hill Road (Old Poverty Road to Fairway Drive)

Please note: schedules subject to change due to weather conditions.

 